13:26 Dec 20 2012 Riverside Park, New York, NY, USA
| Background: context, existing conditions: | .New parkland |
| Design Intent Details: why site was designed the way it was, general specifications, installation cost: | The park was designed on the site of a former railyard and the park design evokes the earlier history of the site. Most of the site is designed for passive recreation. The park includes waterfront seating and overlooks, a pier, lawns and native grass plantings to evoke the original Manhattan shoreline. Installation cost $20M-$30M |
| Impact of Sandy: | damage to rip rap edging. Erosion along the rip rap edge and undermining of aadjacent pavement. Possible damage to turf grass. 2 trees lost to storm damage. Storm inundation left a debris line along the length of the park. |
| Performance During and After Sandy: | .Good other that the rip rap treatment. Spartinas and other native grasses performed will. |
| Lessons Learned and Relevance to Future Design: | Refine rip rap edge design detail. |
| Site Use: | ex. park |
| Size: | acres |
| Area Flooded: | % of total acres - 5 acres |
| Edge Conditions: proportion of hard and soft edges, describe materials and observed erosion or resilience: | 75% hard edge to 25% rip rap |
| Vegetation: % of site with vegetation, describe proportion of turf to dense vegetation, types of plantings and immediate observations on species resilience: | The plant palette of the park, grasses, rosa rugosa, bay berry, willows seem to be resistant to the salt water so far. The turf grass looks fine so far but we will continue to monitor the performance. |
| Storm Water Management Strategy: describe site drainage system and how this fared if inundated: | Catch basins and water sheeting into areas of landscape all performed well but the park was flooded from the river. The water receded leaving a significant amout of debris and sediment in the park. |
| Paving and Permeability: % paved, types of paving, permeability and observed impacts: | Other than park paths, 80% of the park is planted or stone screening. Materials all performed well. |
| Structures and Outdoor Furniture: describe types, materials, damage and resilience: | No damage to out door structures. |
| Total Estimated Cost of Damage: | $150,000 to reconstruct the rip rap edge if we lose all or a percentage of the park plant material the damage could be up to $1.3M. |
| Credibility: | ![]() |
![]() |