»
Sandy: Lessons Learned
Login
Email
Password
Create an Account
Forgot your password?
Registered Email
Afrikaans
Azərbaycan dili (AZ)
Bahasa Indonesia (ID)
Bosanski (BA)
Català (ES)
chiShona
Cymraeg (GB)
Dansk
Deutsch (DE)
English (GB)
English (US)
Español (AR)
Español (CL)
Español (ES)
Español (PE)
Español (VE)
Euskara
Français (FR)
Gaeilge (IE)
Galego
hrvatski
Italiano (IT)
Kiswahili (KE)
Kreyòl ayisyen (HT)
Kurdî, كوردی
Kurdî, كوردی (IQ)
Lietuvių
Luganda
Magyar (HU)
Nederlands (NL)
Norsk
Polski (PL)
Português (BR)
Português (PT)
pr (US)
română (RO)
Shqip (AL)
Slovenčina
Slovenčina (SK)
Slovenščina (SI)
Soomaaliga, af Soomaali
Suomi
Svenska (SE)
Tiếng Việt
Tiếng Việt (VN)
Türkçe (TR)
česky, čeština (CZ)
Ελληνικά
Български (BG)
Македонски (MK)
Русский (RU)
Српски
Српски (RS)
Українська
Українська (UA)
Հայերեն (AM)
עברית (IL)
اردو (PK)
العربية
فارسی
پښتو
ދިވެހި
नेपाली (NP)
हिन्दी, हिंदी (IN)
বাংলা
বাংলা (BD)
ਪੰਜਾਬੀ, پنجابی
తెలుగు
සිංහල
ქართული (GE)
አማርኛ
ភាសាខ្មែរ
中文 (Zhōngwén), 汉语, 漢語
中文 (Zhōngwén), 汉语, 漢語 (CN)
中文 (Zhōngwén), 汉语, 漢語 (TW)
日本語 (にほんご/にっぽんご) (JP)
한국어 (韓國語), 조선말 (朝鮮語) (KR)
Sandy: Lessons Learned
Landscape Design Lessons from Hurricane Sandy
Submit a Report
Home
Reports
Submit a Report
Get Alerts
On the Ground: Lessons Learned from Hurricane Sandy
Survey Instructions
Big Map
Submit a New Report
Report Title
*
Description
*
Allowed HTML tags: "a, p, img, br, b, u, strong, em, i".
Iframes are only allowed from: www.youtube.com/embed/, player.vimeo.com/video/, w.soundcloud.com/player.
Modify Date
Date & Time: Today at
07:53 am
Date
Time
01
02
03
04
05
06
07
08
09
10
11
12
:
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
:
pm
am
(0)
Categories
*
WATERFRONT SITES
Background: context, existing conditions
*
Design Intent Details: why site was designed the way it was, general specifications, installation cost
*
Impact of Sandy
*
Performance During and After Sandy
*
Lessons Learned and Relevance to Future Design
*
Site Use
*
Size
*
Area Flooded
*
Edge Conditions: proportion of hard and soft edges, describe materials and observed erosion or resilience
*
Vegetation: % of site with vegetation, describe proportion of turf to dense vegetation, types of plantings and immediate observations on species resilience
*
Storm Water Management Strategy: describe site drainage system and how this fared if inundated
*
Paving and Permeability: % paved, types of paving, permeability and observed impacts
*
Structures and Outdoor Furniture: describe types, materials, damage and resilience
*
Total Estimated Cost of Damage
*
Optional Information
First Name
Last Name
Email
Label:
Comments:
Color:
Stroke Width:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
Latitude:
Longitude:
DELETE LAST
DELETE SELECTED
CLEAR MAP
* Search for your location using a location name OR latitude,longitude coordinates (format: 38.19, 85.61), OR click on the map to pinpoint the correct location..
Location Name
*
Example: Corner of City Market, 5th Street & 4th Avenue, Johannesburg
News Source Link
add
External Video Link
add
Upload Photos
add